37 CFR 1.136(a) Extensions of Time: The Rules for the Patent Bar
Extensions of time are tested on almost every patent bar exam, usually inside a date question. The rule is 37 CFR 1.136, explained in MPEP 710.02(e). Learn paragraph (a) by heart, and know when (a) is unavailable and (b) or nothing applies. Everything below is checked against the current rule text as at 28 Oct 2026.
The rule in 1.136(a)
- What it extends: a reply period that is nonstatutory or a shortened statutory period, such as the usual 3-month period in an Office action.
- How: file a petition for an extension and the fee in 37 CFR 1.17(a). No reason is needed.
- How far: up to five months past the period set, but never past the maximum statutory period. For an Office action that limit is six months (35 U.S.C. 133).
- Which extension you get: the date you file the petition and fee sets both the length of the extension and the fee. The reply must be filed within the extended period (1.136(a)(2)).
- Petition by default: a written authorization to charge fees, including extension fees, is treated as a constructive petition for an extension. So is paying the 1.17(a) fee with the reply (1.136(a)(3)).
When 1.136(a) is not available
| Situation | Rule |
|---|---|
| The Office action says extensions under 1.136(a) are not available | 1.136(a)(1)(i) |
| A reply brief | 1.136(a)(1)(ii); 37 CFR 41.41 |
| A request for an oral hearing | 1.136(a)(1)(iii); 37 CFR 41.47(a) |
| A reply to a PTAB decision under 41.50, 41.52 or 90.3 | 1.136(a)(1)(iv) |
| An application or patent in a contested case or derivation proceeding | 1.136(a)(1)(v) |
| Periods for the oath or declaration, formal drawings or a deposit set in or after a Notice of Allowability | 1.136(c): not extendable at all |
Extensions for cause: 1.136(b)
Where 1.136(a) does not apply, an extension is possible only for sufficient cause and for a reasonable time the Office states. The request must be filed on or before the day the reply is due, and filing it does not extend the period by itself. If (a) is available, (b) is not.
A worked count
Example
A non-final Office action is mailed March 10 with a 3-month shortened statutory period.
Reply due without an extension: June 10.
With a two-month extension under 1.136(a): August 10.
Latest possible date, with a three-month extension: September 10, the six-month statutory limit.
If the last day falls on a Saturday, Sunday or federal holiday in the District of Columbia, it moves to the next business day (35 U.S.C. 21(b); 37 CFR 1.7).
Trap
Fees under 37 CFR 1.17(a) rise with each month and are reduced for small and micro entities. The exam tests the rules, not the dollar amounts; check the current USPTO fee schedule for real filings.
Practice it
- Check your counts with the USPTO deadline calculator.
- Read the fees, papers and deadlines notes and the examination and responses notes.
- Try a free worked question: one-month extension, last day to reply.
- Plan the rest with the free study plan, then sit the free practice test.
Frequently asked questions
How many months can you extend under 37 CFR 1.136(a)?
Up to five months past the period set, by petition and fee, but never past the maximum statutory period. For an Office action that limit is six months from mailing (35 U.S.C. 133).
Can you extend the time for a reply brief?
Not under 1.136(a): reply briefs, oral hearing requests and replies to Board decisions are excluded. An extension for sufficient cause under 1.136(b) may be requested on or before the due date.
Does paying the extension fee with the reply count as a petition?
Yes. Under 1.136(a)(3), paying the 1.17(a) fee with the reply, or a written authorization to charge fees, is treated as a constructive petition for the extension needed.
Go deeper: study notes
Related guides
Put it into practice
Free account, 900+ original practice questions, instant explanations and full timed practice exams.
Build a daily practice habit — a few exam-style questions a day, with worked answers. Free to start.
Start practicing →Patent Bar Prep is an independent study aid. It is not affiliated with, endorsed by or approved by the United States Patent and Trademark Office (USPTO) or its Office of Enrollment and Discipline (OED). Bank questions are original; USPTO-released exam questions are shown only in separate, labelled sets.